We constructed a photovoltaic shelter in the parking lot next to the Wielkopolska Recycling Center office building in Jarocin. This project was divided into several stages:
- Conducting an audit, calculations, and design preparation.
- Preparing the existing parking lot.
- Pouring the foundations.
- Assembling the canopy structure.
- Installing photovoltaic panels and inverters.
- Connecting the photovoltaic system to the company’s existing energy infrastructure.
Following the audit, our specialists began the necessary calculations and design of the complete installation. The next step was to construct the concrete foundations, ensuring maximum stability for the shelter structure.
After the structure was installed, our technicians began installing the photovoltaic panels and inverters. Earthworks were also carried out simultaneously. To connect the newly constructed installation to the plant’s power grid, a 250-meter-long trench was dug, enabling a connection to the transformer station located next to the newly constructed photovoltaic farm.
Four directional drillings were also performed, allowing for the installation of electrical cables under the parking lot without the need to dismantle the paving stones.
The project included the installation of a total of 633 photovoltaic panels in six rows, with a total capacity of 285 kWp.